Case Study – Supply and design a suitable ducting system to Interserve

By |Case study|

Interserve –GRREC   Location:             Glasgow Value:                   £530,782.00 Date:                    June 2015   Introduction, We were approached by Interserve to supply and design a suitable ducting system with is subjected to excessive pressures both negative and positive for our client’s site in Glasgow. Each ducting size